Shipping Options - change order they are displayed

@carolinathreadz this is true, but previously the local pickup option was just a standard shipping method with no cost and the name changed to “Local Pickup”. The new system is drastically different and gives a tabbed option at checkout for the customer to switch between Store Pickup and Delivery.

This means you’re no longer having to surface a free shipping option with the name Local Pickup at checkout and hoping the customer reads the shipping method title before clicking next.

4 Likes