How to configure a flow to change order shipping location after it's sent?

Andrea-Enea
Visitor
2 0 0

Good morning,

I'm trying to change the location of an order via ZIP by forcing it with FLOW from one shipping location to another, does anyone know how to configure a flow so that AFTER the user has SENT the pre-assigned order to a shipping location the flow can have it changed to another shipping location with the ZIP in the flow?

EX: order from ZIP :00145 -> auto-assigned from cart to SEDE1
FLOW that: from ZIP 00145 transform the shipping location in SEDE02 before the order sent in administration panel.

So I will have an order assigned to shipping location SEDE02 in administration order

Thank you

Reply 1 (1)

paul_n
Shopify Staff
957 128 226

Correction: you can actually change the shipping address. I think it's billing address you cannot change. 

See this thread for how to do it with Send HTTP Request: 

https://community.shopify.com/c/shopify-flow-app/add-address-to-orders-that-do-not-require-shipping/...

 

 

 

 

Paul_N | Flow Product Manager @ Shopify
- Finding Flow useful? Leave us a review
- Need Flow help? Check out our help docs.
- Building for Flow? Check out Flow's dev docs.